Sanimax

Employee Area Renovation Lanthier Construction carried out the renovation of locker rooms, the cafeteria, and various administrative spaces at the Sanimax plant. The project included the reconfiguration of change areas, washroom facilities, offices, and common areas, along with the installation of new finishes, lockers, countertops, and built-in furniture elements. The work was completed with attention […]
L’Oréal Canada

New Wastewater Treatment Facility (Project in Progress) Lanthier Construction is acting as construction manager for the development of a new wastewater treatment facility for L’Oréal Canada’s operations in Ville Saint-Laurent. The project includes the construction of a new technical building as well as the installation of specialized treatment systems. It is being carried out in […]
Roche Diagnostics

Site Modernization This transformation project aims to modernize the work, research, and logistics environments at Roche Diagnostics’ Laval facility. The scope of work includes the renovation of offices and laboratories, the expansion and reconfiguration of the warehouse, and the modernization of administrative spaces in Building C. Two new loading docks are also being added to […]
Jubilant DraxImage

Lanthier Construction carried out the renovation of Jubilant DraxImage’s facilities in Kirkland, including the modernization of specialized laboratories and the fit-out of new office spaces. Completed in multiple phases to maintain plant operations throughout, the project included the reconfiguration of research and analytical laboratories, the integration of new scientific equipment, fume hoods, and specialized mechanical […]
Laboratoires Confab

Expansion of the Secured Shipping Area Lanthier Construction carried out the expansion of Laboratoires Confab’s shipping area to integrate a secured vault for the storage of narcotic products and controlled substances. This project, completed within an active pharmaceutical environment, required rigorous planning and strict coordination to meet the highest standards of security, traceability, and regulatory […]
Carrefour Providence

Renovation of Wings B and B1 The renovation of Wings B and B1 at Carrefour Providence aimed to modernize existing spaces within a major institutional complex, all while maintaining the ongoing activities of its occupants. Carried out in an active environment, the project required rigorous planning, close coordination among all stakeholders, and particular attention to […]
Maison Jean Lapointe
Major Interior Renovation Lanthier Construction is carrying out the interior transformation of Maison Jean Lapointe, adapting an existing building for its new role as a residential care and treatment centre. The project includes a complete reconfiguration of spaces across multiple floors, integrating administrative offices, meeting and therapy rooms, resident bedrooms, and common areas. Every aspect […]
Les Franciscains

Renovation and Code Compliance of Two Institutional Buildings Lanthier Construction carried out the complete renovation of two institutional buildings acquired by the Franciscan community to serve as their new living quarters and administrative headquarters. The project aimed to transform existing structures into functional, accessible spaces tailored to the community’s current needs. The work included architectural […]
Canada Post

Modernization of the Léo-Blanchette Distribution Centre The project involved transforming the Léo-Blanchette distribution centre to integrate a new generation of automated mail-processing equipment. Carried out in an active logistics environment, the work required exemplary coordination to maintain operations, ensure the safety of personnel and goods, and meet the strict technical requirements of the automated systems […]
GAB-Induspac

Plant Expansion Lanthier Construction completed the expansion of GAB-Induspac’s facilities to support the company’s growing manufacturing and logistics operations. The project involved constructing a new section of the building seamlessly integrated with the existing structure, all while keeping the plant fully operational throughout construction. The work required rigorous planning and careful coordination to minimize disruption […]