Saint-Lambert National Bank
- 2019-11-11
![](https://lanthier.ca/wp-content/themes/agenceoz/assets/frontend/pages/img/works/img4.jpg)
Redevelopment of the complete branch including the addition of a new elevator as well as an extension. The work was carried out in the evenings and in phasing stages to keep the branch operational throughout the work.
I like this web blog it’s a master piece! Glad I detected this ohttps://69v.topn google.Blog range